TRAFFIC IMPACT: METRO's Subsurface Investigation Work on Wilshire near the I-405 Off-ramp on Sunday, September 15
Metro contractors will be investigating subsurface conditions, also known as geotechnical investigation, along the tunnel alignment of the Purple Line Extension Section 3 at various locations from now through Fall 2019. Work will occur on eastbound Wilshire Blvd., near the I-405 off-ramp, on Sunday, September 15, from 12am to 7am.
Essentials
Dates: Sunday, September 15
Work Hours: 12am to 7am
Eastbound traffic will be reduced on Wilshire Blvd. between Sepulveda Blvd. and Veteran Ave.
Work will occur on Wilshire Blvd. near the I-405 off-ramp, just west of Veteran Ave.
The I-405 eastbound Wilshire Blvd. exit will be closed.
Metro Access
For information changes to Metro service, please call 323.GoMetro or visit: https://www.metro.net/service/advisories/
What to Expect
All work has received necessary permits and approvals.
Access to driveways, homes & businesses will be maintained at all times unless notified in advance.
Access for pedestrians will be maintained outside of construction zones.
Access for the Fire Department and emergency responders will be maintained.
Temporary lane closures will be required; detours with signage will be implemented.
Parking restrictions will be implemented in the immediate area of the work zone.
Temporary bus stops with relocation signage will be implemented.
For emergencies or issues needing immediate attention only, please call the 24/7 hotline at (213) 922-6934.